project
/
By battermanstg
This project involved a redevelopment plan to transform the abandoned Kerry Ingredients & Flavors manufacturing site, which had contaminated foundry sand, into three planned five-story apartment buildings. The site, which covers 3.42 acres, included features such as driveways, a parking lot, sidewalks, grilling patios, and enclosed dog run areas. It also required the relocation of...
Read More
project
/
By battermanstg
The Gathering Place is a nonprofit senior activity center and a wedding and event venue in Milton, Wisconsin. The project included the construction of a new pavilion, a concession stand, a gazebo, a large open space area with concrete sidewalks, decorative landscaping, and a wind sculpture, as well as a new parking lot to serve...
Read More
project
/
By battermanstg
G-Five Brewing Company’s elevated design calls for smart solutions on steep slopes. The Gateway Brewing LLC selected Batterman to assist with the G-Five Brewing Company project, which included a new brewery and restaurant located in the Gateway Business Park. Engineering services provided included site design to accommodate the new building and parking lot, and to...
Read More
project
/
By battermanstg
Located in the heart of downtown Delavan, the site was constrained on all sides by a State Highway, residential houses, and downtown businesses. The City wanted to expand the park’s square footage to help establish the park as a central, community-defining, public, and event space. The underutilized and overwide lanes of North Main Street and...
Read More
project
/
By battermanstg
CTH H Reconstruction & Perpetuation (2021) This 0.8-mile reconstruction/perpetuation project involved geometric expansion and turn-lane additions to accommodate a 350,000-square-foot Kroger Distribution Center. This Transportation Economic Assistance (TEA) grant project was 50% funded by WisDOT ($950k grant) and included substantial utility relocation and drainage improvements (culverts and storm sewer). A right-of-way plat was required to...
Read More
project
/
By battermanstg
Public Safety and Transportation Center This project was a multiple-phase design and construction of the safety and transportation center on the Blackhawk Technical College campus. It included the construction of a new education building, the Center for Transportation Studies, a fire and building training building, an Emergency Vehicle Operations Course, a 30-foot-deep pond, and various...
Read More
service
/
By battermanstg
Batterman’s Site | Civil Design team supports public and private development projects from initial concept through completion, delivering practical, sustainable, and cost‑effective solutions that overcome even the most complex site challenges...
Read More
project
/
By battermanstg
Caledonia Haulers, a large tanker hauling company that transports canned milk and various food-grade products, partnered with Batterman to upgrade their deteriorating gravel and asphalt driveways and parking areas to a fully functional asphalt parking lot. The project also focused on identifying and resolving issues with two underperforming stormwater basins to ensure compliance with the...
Read More
project
/
By battermanstg
The Town of Delavan hired Batterman to work on the locally important project of improving the water quality of Delavan Lake, which involved dredging three sediment collection ponds and constructing a sediment dewatering facility. These ponds, built in 1992, play a crucial role in trapping, filtering, and retaining sediment and nutrient loadings from approximately 9,482...
Read More
project
/
By battermanstg
Hendricks Commercial Properties, recognized for their commitment to innovative real estate solutions, chose Batterman’s design engineering services to redevelop Irontek Drive, the location for their latest project, Henry Dorrbaker’s Entertainment Lab in Downtown Beloit. This project’s primary challenge was maximizing the outdoor entertainment space while maintaining a turnaround for traffic and fire trucks and effectively...
Read More