Water Resources

Wright & Wagner Lofts

project

/

By battermanstg

This project involved a redevelopment plan to transform the abandoned Kerry Ingredients & Flavors manufacturing site, which had contaminated foundry sand, into three planned five-story apartment buildings. The site, which covers 3.42 acres, included features such as driveways, a parking lot, sidewalks, grilling patios, and enclosed dog run areas. It also required the relocation of...

Read More

The Gathering Place Pavilion and Site Improvements

project

/

By battermanstg

The Gathering Place is a nonprofit senior activity center and a wedding and event venue in Milton, Wisconsin. The project included the construction of a new pavilion, a concession stand, a gazebo, a large open space area with concrete sidewalks, decorative landscaping, and a wind sculpture, as well as a new parking lot to serve...

Read More

CTH Q Resurfacing and Multi-Use Path

project

/

By battermanstg

This 0.5-mile resurfacing project in the Town of Beloit was funded through the State Transportation Program-Urban (STP-Urban). The project resurfaced the four-lane section of CTH Q from CTH D to the Newark Road Bridge over the Rock River, and also added an off-road multi-use path along the south side of CTH Q. This is part...

Read More
Blackhawk Technical College SIte Improvements

Blackhawk Technical College Expansion & Site Improvements

project

/

By battermanstg

Public Safety and Transportation Center This project was a multiple-phase design and construction of the safety and transportation center on the Blackhawk Technical College campus. It included the construction of a new education building, the Center for Transportation Studies, a fire and building training building, an Emergency Vehicle Operations Course, a 30-foot-deep pond, and various...

Read More
water resource and stormwater serevices

Water Resources

service

/

By battermanstg

Proper stormwater management is essential for municipalities, businesses, and construction sites—protecting infrastructure, preserving natural habitats, and reducing the risks of flooding or system failure. ...

Read More

Caledonia Haulers Parking Lot and Stormwater Basin Improvements

project

/

By battermanstg

Caledonia Haulers, a large tanker hauling company that transports canned milk and various food-grade products, partnered with Batterman to upgrade their deteriorating gravel and asphalt driveways and parking areas to a fully functional asphalt parking lot. The project also focused on identifying and resolving issues with two underperforming stormwater basins to ensure compliance with the...

Read More

Henry Dorrbaker’s Entertainment Lab

project

/

By battermanstg

Hendricks Commercial Properties, recognized for their commitment to innovative real estate solutions, chose Batterman’s design engineering services to redevelop Irontek Drive, the location for their latest project, Henry Dorrbaker’s Entertainment Lab in Downtown Beloit. This project’s primary challenge was maximizing the outdoor entertainment space while maintaining a turnaround for traffic and fire trucks and effectively...

Read More

500,000-Square-Foot Spec Warehouse

project

/

By battermanstg

Corporate Contractors, Inc. (CCI), a leading general contracting firm, partnered with Batterman to provide site design services for a new 500,000-square-foot spec warehouse building on a 55.40-acre parcel in the Gateway Business Park. The project presented several challenges, including a significant grade change across the site, unique storm water routing requirements, poor soils, and existing...

Read More