Beloit College Powerhouse Riverwalk

Project Name: Beloit College Powerhouse Riverwalk

Project Description: The Powerhouse Riverwalk Bridge is a 10-span pedestrian bridge along the Rock River as a part of the Beloit College Powerhouse Building. The project was part of the riverfront revitalization commitment made by the City of Beloit and connects a gap in the riverfront trail system through the area.

The Powerhouse Riverwalk project provides a unique multi-use path connection that surrounds the new Beloit College Powerhouse. The decommissioned Alliant Energy Blackhawk Generating Station was repurposed to a multi-use student facility. The path is land-based near the north and south termini where the new path ties into existing City path systems.

Substantial vertical grade difference is present throughout the corridor as the path traverses along the Rock River on land, and then transitions to a ten-span bridge system which is set to match future doorway connections on the repurposed Powerhouse building. The path is designed to accommodate both the horizontal and vertical locations of the various floors of the old building.

Client: WisDOT, City of Beloit.

Location: City of Beloit

Project Year: 2020

Lead Batterman Staff: Lead – Jon Olinger, Inspectors: Jeff Scott, Colten Tuescher

Batterman Services: Construction Management

Biggest Challenge and How it was Solved: Construction Access along the riverfront was limited. The design engineers and contractors came up with using a temporary access bridge that allowed the contractor to set up a barge in the water to complete the structure along the Powerhouse building.

Field Data: 1,782 LF of 21-Inch Box Girders, 2,120 LF of Piling.

Related Markets: Parks/Recreation

Related Projects

US-12 & STH 11 Improvements (including stream realignments)

US-12 & STH 11 Improvements (including stream realignments)

The US-12 and STH 11 improvements project involved resurfacing 7.25 miles of roadway, reconstructing the Sugar Creek Bridge and Bakers Creek box culvert, and upgrading the US-12 and County ES intersection with new traffic signals. The most complex aspect of this project was managing the realignment of two environmentally sensitive streams under challenging conditions and strict regulations.
County Trunk Highway T – LiDAR Survey

County Trunk Highway T – LiDAR Survey

The steep slopes and dense vegetation surrounding this roadway posed significant challenges and safety concerns for the survey crew when using conventional methods. To address this concern, Batterman was asked to provide aerial survey assistance by leveraging LiDAR UAV technology.
Henry Dorrbaker’s Entertainment Lab

Henry Dorrbaker’s Entertainment Lab

This project’s primary challenge was maximizing the outdoor entertainment space while maintaining a turnaround for traffic and fire trucks and effectively managing storm water. Through strategic planning, public engagement, and creative engineering led by Batterman, the project successfully navigated space constraints and environmental hurdles, helping this exciting addition to the downtown landscape to move forward.
500,000-Square-Foot Spec Warehouse

500,000-Square-Foot Spec Warehouse

This project in the Gateway Business Park presented several challenges, including a significant grade change across the site, unique storm water routing requirements, poor soils, and existing infrastructure elements. Despite these challenges, the project stayed on its aggressive schedule, showcasing the importance of early due diligence and proactive problem-solving.
I-39 Highway Project

I-39 Reconstruction (STH 11 to USH 14)

This complex IH 39 expansion project involved reconstruction of the most urban section of the IH 39 corridor from STH 11 to USH 14. Key components of this complex staged project include twelve bridges, six MSE retaining walls, nine noise walls, major grading operations, four lanes of concrete pavement, and all new storm sewer.
County H In Kenosha County

County Highway H Reconstruction

This 0.8-mile reconstruction/perpetuation project includes geometric expansion and turn lane additions required for a 350,000 SF Kroger Distribution Center.