Beloit College Powerhouse Riverwalk

Project Name: Beloit College Powerhouse Riverwalk

Project Description: The Powerhouse Riverwalk Bridge is a 10-span pedestrian bridge along the Rock River as a part of the Beloit College Powerhouse Building. The project was part of the riverfront revitalization commitment made by the City of Beloit and connects a gap in the riverfront trail system through the area.

The Powerhouse Riverwalk project provides a unique multi-use path connection that surrounds the new Beloit College Powerhouse. The decommissioned Alliant Energy Blackhawk Generating Station was repurposed to a multi-use student facility. The path is land-based near the north and south termini where the new path ties into existing City path systems.

Substantial vertical grade difference is present throughout the corridor as the path traverses along the Rock River on land, and then transitions to a ten-span bridge system which is set to match future doorway connections on the repurposed Powerhouse building. The path is designed to accommodate both the horizontal and vertical locations of the various floors of the old building.

Client: WisDOT, City of Beloit.

Location: City of Beloit

Project Year: 2020

Lead Batterman Staff: Lead – Jon Olinger, Inspectors: Jeff Scott, Colten Tuescher

Batterman Services: Construction Management

Biggest Challenge and How it was Solved: Construction Access along the riverfront was limited. The design engineers and contractors came up with using a temporary access bridge that allowed the contractor to set up a barge in the water to complete the structure along the Powerhouse building.

Field Data: 1,782 LF of 21-Inch Box Girders, 2,120 LF of Piling.

Related Markets: Parks/Recreation

Related Projects

500,000-Square-Foot Spec Warehouse

500,000-Square-Foot Spec Warehouse

This project in the Gateway Business Park presented several challenges, including a significant grade change across the site, unique storm water routing requirements, poor soils, and existing infrastructure elements. Despite these challenges, the project stayed on its aggressive schedule, showcasing the importance of early due diligence and proactive problem-solving.
I-39 Highway Project

I-39 Reconstruction (STH 11 to USH 14)

This complex IH 39 expansion project involved reconstruction of the most urban section of the IH 39 corridor from STH 11 to USH 14. Key components of this complex staged project include twelve bridges, six MSE retaining walls, nine noise walls, major grading operations, four lanes of concrete pavement, and all new storm sewer.
County H In Kenosha County

County Highway H Reconstruction

This 0.8-mile reconstruction/perpetuation project includes geometric expansion and turn lane additions required for a 350,000 SF Kroger Distribution Center.
Delavan Tower Project

Delavan Tower Park

Project Description: Located in the heart of downtown Delevan, the site was constrained on all sides by a State Highway, residential houses, and downtown businesses. The City wanted to expand the park’s square footage to help establish the park as a central, community-defining, public, and event space.
G5 Brewing Company

G5 Brewing Company

The G5 Brewing Company project included a new brewery and restaurant located in the Gateway Business Park. The project included site design to accommodate the new building, parking lot and provided storm water areas to treat runoff before leaving the site. 
environmental landscape

Beloit Turner Middle School Administration Parking Lot Expansion

Seal Coat and modifications of the existing parking lot to improve traffic flow, safety, and ADA access, 71 parking stall expansion of the parking lot and connection to Flack Road. Grading and berms for on campus cross country routes.