Delavan Tower Park

Project Name: Tower Park and Adjacent Street Improvements

Project Description: Located in the heart of downtown Delavan, the site was constrained on all sides by a State Highway, residential houses, and downtown businesses. The City wanted to expand the park’s square footage to help establish the park as a central, community-defining, public, and event space.

The underutilized and overwide lanes of North Main Street and Second Street were decreased to allow for the expansion of the park. Park Place was widened and reconfigured to a one-way street to enhance safety and allow for more parking and efficient functions for the existing businesses.

The existing water tower, historic Circus theme and statues, and brick pavers on Walworth avenue were all incorporated and preserved into the design. During construction, multiple meetings with residents and business owners were held to identify construction and business schedules such as deliveries, appointments, and classes to minimize the impacts of construction on the business operations.

Client: City of Delavan

Location: Delavan, Wisconsin

Project Year: 2019-2021

Lead Batterman Staff: Alex Feuling, Lucas Hoerz, Sonnie Brockwell

Batterman Services: Topographic Survey, Roadway Design, Site Design, Construction Management

Related Projects

US-12 & STH 11 Improvements (including stream realignments)

US-12 & STH 11 Improvements (including stream realignments)

The US-12 and STH 11 improvements project involved resurfacing 7.25 miles of roadway, reconstructing the Sugar Creek Bridge and Bakers Creek box culvert, and upgrading the US-12 and County ES intersection with new traffic signals. The most complex aspect of this project was managing the realignment of two environmentally sensitive streams under challenging conditions and strict regulations.
County Trunk Highway T – LiDAR Survey

County Trunk Highway T – LiDAR Survey

The steep slopes and dense vegetation surrounding this roadway posed significant challenges and safety concerns for the survey crew when using conventional methods. To address this concern, Batterman was asked to provide aerial survey assistance by leveraging LiDAR UAV technology.
Henry Dorrbaker’s Entertainment Lab

Henry Dorrbaker’s Entertainment Lab

This project’s primary challenge was maximizing the outdoor entertainment space while maintaining a turnaround for traffic and fire trucks and effectively managing storm water. Through strategic planning, public engagement, and creative engineering led by Batterman, the project successfully navigated space constraints and environmental hurdles, helping this exciting addition to the downtown landscape to move forward.
500,000-Square-Foot Spec Warehouse

500,000-Square-Foot Spec Warehouse

This project in the Gateway Business Park presented several challenges, including a significant grade change across the site, unique storm water routing requirements, poor soils, and existing infrastructure elements. Despite these challenges, the project stayed on its aggressive schedule, showcasing the importance of early due diligence and proactive problem-solving.
I-39 Highway Project

I-39 Reconstruction (STH 11 to USH 14)

This complex IH 39 expansion project involved reconstruction of the most urban section of the IH 39 corridor from STH 11 to USH 14. Key components of this complex staged project include twelve bridges, six MSE retaining walls, nine noise walls, major grading operations, four lanes of concrete pavement, and all new storm sewer.
County H In Kenosha County

County Highway H Reconstruction

This 0.8-mile reconstruction/perpetuation project includes geometric expansion and turn lane additions required for a 350,000 SF Kroger Distribution Center.