G5 Brewing Company
Project Description: The G5 Brewing Company project included a new brewery and restaurant located in the Gateway Business Park. The project included site design to accommodate the new building, parking lot and provided stormwater areas to treat runoff before leaving the site. The site had extreme topography changes and required a retaining wall to accommodate a driveway that would be at safe and reasonable slopes.
Client: Gateway Brewing LLC
Location: Beloit, WI
Project Year: 2016/2017
Lead Batterman Staff: Frank McKearn, Ellyn Subak, Alex Feuling, Lucas Chase
Batterman Services: Civil Design, Survey
Related Projects
500,000-Square-Foot Spec Warehouse
This project in the Gateway Business Park presented several challenges, including a significant grade change across the site, unique storm water routing requirements, poor soils, and existing infrastructure elements. Despite these challenges, the project stayed on its aggressive schedule, showcasing the importance of early due diligence and proactive problem-solving.
I-39 Reconstruction (STH 11 to USH 14)
This complex IH 39 expansion project involved reconstruction of the most urban section of the IH 39 corridor from STH 11 to USH 14. Key components of this complex staged project include twelve bridges, six MSE retaining walls, nine noise walls, major grading operations, four lanes of concrete pavement, and all new storm sewer.
County Highway H Reconstruction
This 0.8-mile reconstruction/perpetuation project includes geometric expansion and turn lane additions required for a 350,000 SF Kroger Distribution Center.
Delavan Tower Park
Project Description: Located in the heart of downtown Delevan, the site was constrained on all sides by a State Highway, residential houses, and downtown businesses. The City wanted to expand the park’s square footage to help establish the park as a central, community-defining, public, and event space.
Beloit College Powerhouse Riverwalk
10 span pedestrian bridge along the Rock River as part of the Beloit College Powerhouse Building. The project will be a part of the riverfront revitalization commitment made by the City of Beloit and will connect a gap in the riverfront trail system through the area.
Beloit Turner Middle School Administration Parking Lot Expansion
Seal Coat and modifications of the existing parking lot to improve traffic flow, safety, and ADA access, 71 parking stall expansion of the parking lot and connection to Flack Road. Grading and berms for on campus cross country routes.