Beloit Turner Middle School Administration Parking Lot Expansion

Beloit Turner Middle School Administration Parking Lot Expansion

Project Description: Seal Coat and modifications of the existing parking lot to improve traffic flow, safety, and ADA access, 71 parking stall expansion of the parking lot and connection to Flack Road. Grading and berms for on campus cross country routes.

Client: Beloit Turner School District

Location: 1237 E Inman Parkway, Town of Beloit, WI

Project Year: 2021

Lead Batterman Staff: Alex Feuling

Testimonial: 

Batterman Services: Survey-topo, Site Design-parking lot, permitting, bid solicitation and contracting, construction management/inspection, construction staking

Biggest Challenge and How it was Solved: The school wanted to include some berms and grade change on site for a future cross-country route. The site is fairly flat and the parking lot expansion project would not yield a significant amount of spoil material.

Spoil material from 4 other Turner School District projects scheduled to take place at the same time was coordinated to provide the required amount of material to construct the berms.

Contract Value: construction $165,000

Contract: $39,000

Field Data: 195,105 sqft, 4.48 acres

Related Markets: education,

Photos: currently under construction

Related Projects

US-12 & STH 11 Improvements (including stream realignments)

US-12 & STH 11 Improvements (including stream realignments)

The US-12 and STH 11 improvements project involved resurfacing 7.25 miles of roadway, reconstructing the Sugar Creek Bridge and Bakers Creek box culvert, and upgrading the US-12 and County ES intersection with new traffic signals. The most complex aspect of this project was managing the realignment of two environmentally sensitive streams under challenging conditions and strict regulations.
County Trunk Highway T – LiDAR Survey

County Trunk Highway T – LiDAR Survey

The steep slopes and dense vegetation surrounding this roadway posed significant challenges and safety concerns for the survey crew when using conventional methods. To address this concern, Batterman was asked to provide aerial survey assistance by leveraging LiDAR UAV technology.
Henry Dorrbaker’s Entertainment Lab

Henry Dorrbaker’s Entertainment Lab

This project’s primary challenge was maximizing the outdoor entertainment space while maintaining a turnaround for traffic and fire trucks and effectively managing storm water. Through strategic planning, public engagement, and creative engineering led by Batterman, the project successfully navigated space constraints and environmental hurdles, helping this exciting addition to the downtown landscape to move forward.
500,000-Square-Foot Spec Warehouse

500,000-Square-Foot Spec Warehouse

This project in the Gateway Business Park presented several challenges, including a significant grade change across the site, unique storm water routing requirements, poor soils, and existing infrastructure elements. Despite these challenges, the project stayed on its aggressive schedule, showcasing the importance of early due diligence and proactive problem-solving.
I-39 Highway Project

I-39 Reconstruction (STH 11 to USH 14)

This complex IH 39 expansion project involved reconstruction of the most urban section of the IH 39 corridor from STH 11 to USH 14. Key components of this complex staged project include twelve bridges, six MSE retaining walls, nine noise walls, major grading operations, four lanes of concrete pavement, and all new storm sewer.
County H In Kenosha County

County Highway H Reconstruction

This 0.8-mile reconstruction/perpetuation project includes geometric expansion and turn lane additions required for a 350,000 SF Kroger Distribution Center.