Beloit Turner Middle School Administration Parking Lot Expansion

Beloit Turner Middle School Administration Parking Lot Expansion

Project Description: Seal Coat and modifications of the existing parking lot to improve traffic flow, safety, and ADA access, 71 parking stall expansion of the parking lot and connection to Flack Road. Grading and berms for on campus cross country routes.

Client: Beloit Turner School District

Location: 1237 E Inman Parkway, Town of Beloit, WI

Project Year: 2021

Lead Batterman Staff: Alex Feuling

Testimonial: 

Batterman Services: Survey-topo, Site Design-parking lot, permitting, bid solicitation and contracting, construction management/inspection, construction staking

Biggest Challenge and How it was Solved: The school wanted to include some berms and grade change on site for a future cross-country route. The site is fairly flat and the parking lot expansion project would not yield a significant amount of spoil material.

Spoil material from 4 other Turner School District projects scheduled to take place at the same time was coordinated to provide the required amount of material to construct the berms.

Contract Value: construction $165,000

Contract: $39,000

Field Data: 195,105 sqft, 4.48 acres

Related Markets: education,

Photos: currently under construction

Related Projects

500,000-Square-Foot Spec Warehouse

500,000-Square-Foot Spec Warehouse

This project in the Gateway Business Park presented several challenges, including a significant grade change across the site, unique storm water routing requirements, poor soils, and existing infrastructure elements. Despite these challenges, the project stayed on its aggressive schedule, showcasing the importance of early due diligence and proactive problem-solving.
I-39 Highway Project

I-39 Reconstruction (STH 11 to USH 14)

This complex IH 39 expansion project involved reconstruction of the most urban section of the IH 39 corridor from STH 11 to USH 14. Key components of this complex staged project include twelve bridges, six MSE retaining walls, nine noise walls, major grading operations, four lanes of concrete pavement, and all new storm sewer.
County H In Kenosha County

County Highway H Reconstruction

This 0.8-mile reconstruction/perpetuation project includes geometric expansion and turn lane additions required for a 350,000 SF Kroger Distribution Center.
Delavan Tower Project

Delavan Tower Park

Project Description: Located in the heart of downtown Delevan, the site was constrained on all sides by a State Highway, residential houses, and downtown businesses. The City wanted to expand the park’s square footage to help establish the park as a central, community-defining, public, and event space.
Beloit Powerhouse Bridge Walk

Beloit College Powerhouse Riverwalk

10 span pedestrian bridge along the Rock River as part of the Beloit College Powerhouse Building.  The project will be a part of the riverfront revitalization commitment made by the City of Beloit and will connect a gap in the riverfront trail system through the area.
G5 Brewing Company

G5 Brewing Company

The G5 Brewing Company project included a new brewery and restaurant located in the Gateway Business Park. The project included site design to accommodate the new building, parking lot and provided storm water areas to treat runoff before leaving the site.